Quality Management Target Operating Model at Uniper Energy

Quality management Target Operating Model (TOM) workshop event at Uniper Energy, run by CI Projects

Improved quality maturity

Ability to measure COPQ

Enhanced safety performance

Increased cultural engagement

The CI Projects team are knowledgeable, respectful and responsive providing a flexible and progressive approach to help us move through a complex project.

Director at Uniper Energy

Define it

CI Projects were commissioned to support Uniper Energy with defining and implementing a Target Operating Model (TOM) that ensures quality is managed to an agreed standard via a fit-for-purpose Quality Management System (QMS), with embedded roles, standardised processes, and robust communications.

Uniper Energy’s commitment to quality was hindered by:

  • Inconsistent standards across regions, fleets, and technologies.
  • Local deviations and non-compliance leading to safety-related incidents, rework, and outage extensions.
  • Lack of a unified framework for quality roles, responsibilities, and processes.

Improve it

Our approach included:

  1. As-Is Analysis: Conducted stakeholder interview groups, consolidated findings, and performed SWOT, GAP, competitor benchmarking, and maturity assessments.
  2. Stakeholder Engagement: Delivered four key workshops to validate insights and co-create solutions.
  3. TOM Design: Developed multiple models (Centralised, Decentralised, Hybrid) and refined options based on feedback. Selected a Hybrid approach as the most viable.
  4. Culture & Communications: Designed a strategic plan to embed quality principles and drive engagement across the energy assets division.
  5. Benchmarking: Compared Uniper’s practices against industry leaders using Lean, Six Sigma, and operational excellence frameworks.

Sustain it

To ensure sustainability, CI Projects:

  • Developed enhancement for existing roles and responsibilities as a stepping stone toward full TOM implementation.
  • Defined improvements in data collection to measure Cost of Poor Quality (COPQ) and quality maturity.
  • Developed a roadmap for cultural change and continuous improvement.

More case studies in this sector

CRM System Implementation at Lightsource bp

Implementation of a centralised CRM system to address challenges and empower Lightsource bp for success.

Community Engagement CRM Implementation

Project Management of a new Customer Relationship Management (CRM) system to enhance stakeholder record management and accessibility.
Technology Change at lightsource BP

Technology Change Programme at Lightsource bp

Developed a change management programme to support a new enterprise system rollout, including a Learning Academy, SharePoint and business readiness sessions tailored by role and function.