NPS baseline established at 0
End-to-end PMO lifecycle reviewed
University-wide stakeholder engagement
Prioritised improvement roadmap developed
CI Projects has been great to work with. Thank you.
Anonymous feedback
Define it
Manchester Metropolitan University (MMU) recognised that despite having established governance structures, methodologies, and project management tools in place, its IT Project Management Office (PMO) was facing increasing pressure from growing demand, constrained capacity, and rising stakeholder expectations.
CI Projects undertook a comprehensive review of the current operating model, combining data analysis with extensive stakeholder engagement across the university. The review sought to identify barriers to effective delivery, understand stakeholder experiences, and assess PMO maturity against recognised best practice.
We completed the following activities:
- Reviewed the end‑to‑end IT project and request lifecycle, including governance and decision points
- Conducted Voice of the People engagement across academic, professional services, and IT teams
- Assessed PMO maturity against recognised best practice
- Analysed prioritisation mechanisms, backlog health, and demand versus capacity
- Reviewed governance forums, reporting, and use of supporting tools
The review identified that MMU had strong foundations in place, including a documented governance framework, established methodologies, and improving reporting capability. However, these were not consistently applied or clearly understood across the organisation.
Key challenges included:
- Lack of transparency and visibility, creating a “black box” perception once requests were submitted
- Unclear prioritisation and decision rationale, particularly for BAU and small change activity
- Over‑engineered early‑stage processes, slowing momentum before value was validated
- Inconsistent communication, leading to repeated chasing and stakeholder frustration
- Limited visibility of demand versus capacity, restricting effective portfolio planning
Stakeholder feedback reinforced these findings, with an overall Net Promoter Score of 0, indicating a neutral experience with significant opportunity for improvement.
Improve it
Working collaboratively with MMU, CI Projects translated insight into a prioritised set of improvement opportunities focused on improving flow, confidence, and decision‑making – without adding unnecessary bureaucracy.
Key improvement themes included:
- Simplifying the front door for demand management by introducing clearer and more transparent prioritisation criteria
- Streamlining the delivery model to remove duplication, reduce hand-offs, and improve ownership throughout the lifecycle
- Strengthening governance structures to enable faster, more effective decision-making
- Improving communications and stakeholder engagement through consistent updates and defined service expectations
- Creating greater visibility of demand versus capacity to support realistic planning and prioritisation
- Clarifying the role of the PMO to strengthen governance, reporting, mentoring, and portfolio management capabilities
Improvements were prioritised using an impact‑versus‑effort approach to identify quick wins alongside longer‑term structural change.
Sustain it
To ensure improvements could be embedded and maintained over the long term, CI Projects worked with MMU to establish clear ownership, measurement frameworks, and governance arrangements. The focus was on enabling continuous improvement and creating a PMO capable of adapting to future organisational needs.
Key sustainability activities included:
- Defining practical performance measures to track service responsiveness, transparency, backlog health, and decision effectiveness.
- Designing fit-for-purpose reporting aligned to the needs of senior leaders, sponsors, project managers, and delivery teams.
- Building upon existing PMO strengths rather than replacing established frameworks, ensuring improvements remained achievable and scalable.
- Creating a structured roadmap to support ongoing PMO development and capability growth.
By focusing on visibility, communication, governance, and prioritisation, MMU now has a clear pathway to strengthen PMO maturity and improve outcomes for colleagues, students, and the wider university community.
Key benefits
- Clear, evidence-based understanding of PMO strengths and challenges
- Improved insight into stakeholder needs and sources of frustration
- Prioritised improvement roadmap aligned to university objectives
- Enhanced capability to position the PMO as a strategic partner rather than a purely administrative function
- Stronger foundations for future portfolio management, governance, and delivery excellence




