c. £360k cost savings achieved
40% reduction in summer staffing levels
50% reduction in office cleaning frequency
Enhanced service quality & consistency
We saved £360k. Thank you!
Interim Director of Estates
Define it
At De Montfort University, CI Projects was commissioned to transform the cleaning operations, with the goal of driving cleaning service efficiency, standardisation, and service excellence. The project set out to tackle a range of operational challenges that were impacting both costs and stakeholder satisfaction.
The initial assessment uncovered several critical issues. Cleaning activities were frequently exceeding Service Level Agreements, particularly in low-occupancy areas, resulting in unnecessary expenditure and wasted effort. There was a lack of standardisation across teams, leading to variable service quality and frequent complaints – most notably regarding toilet cleanliness, which was the most common source of dissatisfaction among building users. Staffing levels remained unchanged even during periods of low university occupancy, such as the summer break, further compounding inefficiencies. Manual, paper-based processes and minimal use of technology meant that scheduling and resource allocation were far from optimal. Additionally, unclear roles and responsibilities led to duplication of effort and a lack of accountability.
Improve it
To address these challenges, CI Projects undertook a Lean Six Sigma review, applying the DMAIC methodology to analyse and redesign the way cleaning teams operated. The team mapped existing workflows, identified bottlenecks, and developed streamlined, standardised cleaning schedules, including the introduction of colour-coded systems for greater clarity. Resource optimisation was achieved by recommending term-time contracts and floating staff models, ensuring that workforce levels matched actual demand during both peak and off-peak periods. Technology enablement was a key part of the solution, with the introduction of automated cleaning robots for large floor areas and an electronic HR system to improve staff management. To drive ongoing improvement, CI Projects advocated for the reinstatement of Key Performance Indicators, providing a robust framework for tracking performance and outcomes.
Sustain it
Sustainability was embedded throughout the project. CI Projects prioritised stakeholder engagement, gathering feedback from cleaning managers, supervisors, and staff to ensure that solutions were practical and aligned with operational realities. A comprehensive communication plan was developed, ensuring that all stakeholders understood the new schedules, standards, and expectations. The benefits measurement plan established at the end of the project provided a clear mechanism for tracking and reporting ongoing improvements to leadership, supporting long-term operational excellence.
Key benefits
- £360,000 annual savings by aligning cleaning staff levels with university occupancy and reducing unnecessary cleaning in low-traffic areas.
- 40% reduction in summer staffing through the introduction of term-time contracts, matching workforce to actual demand.
- 50% reduction in office cleaning frequency for hybrid and low-occupancy spaces, saving 50 hours per week.
- Enhanced service quality and consistency via standardised schedules, dedicated toilet cleaning teams, and the introduction of automated cleaning robots.
Beyond the financial impact, the project delivered improved efficiency through streamlined processes and better resource allocation. Enhanced service quality resulted in greater stakeholder satisfaction, while the use of KPIs and technology enabled data-driven decision-making and continuous improvement. Most importantly, the new operating model supports ongoing adaptation to the university’s changing needs, ensuring that the benefits are sustained well into the future.