Cleaning Service Efficiency Improvement at De Montfort University

c. £360k cost savings achieved

40% reduction in summer staffing levels

50% reduction in office cleaning frequency

Enhanced service quality & consistency

We saved £360k. Thank you!

Interim Director of Estates

Define it

At De Montfort University, CI Projects was commissioned to transform the cleaning operations, with the goal of driving cleaning service efficiency, standardisation, and service excellence. The project set out to tackle a range of operational challenges that were impacting both costs and stakeholder satisfaction.

The initial assessment uncovered several critical issues. Cleaning activities were frequently exceeding Service Level Agreements, particularly in low-occupancy areas, resulting in unnecessary expenditure and wasted effort. There was a lack of standardisation across teams, leading to variable service quality and frequent complaints – most notably regarding toilet cleanliness, which was the most common source of dissatisfaction among building users. Staffing levels remained unchanged even during periods of low university occupancy, such as the summer break, further compounding inefficiencies. Manual, paper-based processes and minimal use of technology meant that scheduling and resource allocation were far from optimal. Additionally, unclear roles and responsibilities led to duplication of effort and a lack of accountability.

Improve it

To address these challenges, CI Projects undertook a Lean Six Sigma review, applying the DMAIC methodology to analyse and redesign the way cleaning teams operated. The team mapped existing workflows, identified bottlenecks, and developed streamlined, standardised cleaning schedules, including the introduction of colour-coded systems for greater clarity. Resource optimisation was achieved by recommending term-time contracts and floating staff models, ensuring that workforce levels matched actual demand during both peak and off-peak periods. Technology enablement was a key part of the solution, with the introduction of automated cleaning robots for large floor areas and an electronic HR system to improve staff management. To drive ongoing improvement, CI Projects advocated for the reinstatement of Key Performance Indicators, providing a robust framework for tracking performance and outcomes.

Sustain it

Sustainability was embedded throughout the project. CI Projects prioritised stakeholder engagement, gathering feedback from cleaning managers, supervisors, and staff to ensure that solutions were practical and aligned with operational realities. A comprehensive communication plan was developed, ensuring that all stakeholders understood the new schedules, standards, and expectations. The benefits measurement plan established at the end of the project provided a clear mechanism for tracking and reporting ongoing improvements to leadership, supporting long-term operational excellence.

More case studies in this sector

Billing Process Automation & Improvement at Equans

Achieved a 12% increase in revenue through implementing new automated processes, systems and reporting to reduce revenue leakage.

Mobilisation of a new Government Company across Prison Services

Mobilisation and Target Operating Model design for a new, multi-million pound government company overseeing prison services

PMO-as-a-Service for Equans

Set up a PMO and rationalised over 200 projects down to under 30 high priority strategic projects. Increased on-time project delivery by 88% and over £200k benefits in 6 months.