38,400 PPM hours removed, resulting in savings of £768k
88% Reduction in PPM task volume through consolidation & optimisation
8% of assets removed from scope, reducing over 5000 tasks
Fully integrated lifecycle data, including condition ratings & replacement costs
Would just like to say thanks so much to CI Projects and Steve and Charlie in particular for helping to pull this off, massive amount of work and getting it into a good place for the start of our new Estates Hard FM delivery model.
James McCabe, Principle Project Manager
Define it
Chelsea & Westminster NHS Trust embarked on a strategic transformation to shift from an outsourced facilities management (FM) model to an in-house delivery approach. To support this transition, the Trust procured CAFM Explorer by IDOX as its Hard Services CAFM solution. The goal was to ensure seamless delivery of Planned Preventive Maintenance (PPM) from Day 1, while maintaining compliance and operational continuity.
CI Projects was engaged to lead the structuring and loading of asset and PPM data into CAFM Explorer. This included transforming the full asset and space data collected by Sircle Ltd into a format suitable for CAFM integration, laying the foundation for lifecycle management and compliance tracking.
Improve it
CI Projects delivered a comprehensive and optimised setup, including:
- Asset Register Development: Over 34,000 assets were reviewed, categorised, and loaded into CAFM Explorer. Assets were grouped into logical PPM bundles, with unique identifiers and lifecycle data embedded for future reporting.
- PPM Regime Rationalisation: Using SFG20 standards via Facilities IQ, CI Projects streamlined the PPM regime by:
- Removing low-value, high-frequency tasks.
- Consolidating 34,436 assets into 3,272 PPMs, reducing administrative burden and improving task efficiency.
- Eliminating 8% of assets from PPM scope.
- Location & Compliance Data Integration: Clinical and non-clinical space types were defined, enabling SLA differentiation and hazard identification. Asset tags, condition ratings, install dates, and replacement costs were embedded for compliance and lifecycle tracking.
- System Configuration & Workflows: All supporting data—building addresses, SLA definitions, work order types, helpdesk scripts, and process maps—were loaded and configured to support the Trust’s operating model.
Sustain it
To ensure long-term success and continuous improvement, CI Projects provided a roadmap for ongoing optimisation:
- PPM Balancing: Recommendations to review and smooth annual maintenance profiles based on team and subcontractor capacity.
- Compliance Prioritisation: Guidance to identify and address any potential compliance gaps.
- Component Rationalisation: Encouragement for engineering teams to assess and refine PPMs, especially for non-statutory or component-level assets.
- Plant Room Tours & Insurance Inspections: Suggestions to consolidate visual checks and incorporate insurance inspections into the CAFM system for comprehensive compliance reporting.
- User Checks & Building Fabric: Highlighted areas for future development, including user-led equipment checks and building fabric data collection.
Key benefits
- Operational Efficiency – 38,400 PPM hours removed, equating to a saving of 22 FTEs and approximately £768,000 in potential labour costs.
- Operational Efficiency – 89% reduction in PPM task volume through asset consolidation and schedule optimisation.
- Operational Efficiency – 8% of assets removed from PPM scope, reducing unnecessary maintenance tasks by around 5,000 annually
- Improved Compliance and Lifecycle Management – Full integration of asset lifecycle data, including condition ratings, install dates, and replacement costs.
- Enhanced CAFM Functionality – Over 34,000 assets loaded into CAFM Explorer with unique identifiers and grouped PPMs.
- Enhanced CAFM Functionality – Helpdesk scripts, work order types, and SLA definitions configured to support the operating model.